CE1258 – SURVEYING PRACTICAL II
CE1258 – SURVEYING PRACTICAL II
L T P C
0 0 4 2
LIST OF EXPERIMENTS
1. Study of theodolite
2. Measurement of horizontal angles by reiteration and repetition and vertical angles
3. Theodolite survey traverse
4. Heights and distances - Triangulation - Single plane method.
5. Tacheometry - Tangential system - Stadia system - Subtense system.
6. Setting out works - Foundation marking - Simple curve (right/left-handed) -
Transition curve.
7. Field observation for and Calculation of azimuth
8. Field work using Total Station
Total: 60
LIST OF EQUIPMENTS
(For a batch of 30 students)
S. No. Description of Equipments Quantity
1. Total Station 3 Nos
2. Theodolites
Atleast 1 for every 10
students
3. Dumpy level
Atleast 1 for every 10
students
4. Plain table
Atleast 1 for every 10
students
5. Pocket stereoscope 1
6. Ranging rods
7. Leveling staff
8. Cross staff
9. Chains
10. Tapes
11. Arrows
1 for a set of 5 students
L T P C
0 0 4 2
LIST OF EXPERIMENTS
1. Study of theodolite
2. Measurement of horizontal angles by reiteration and repetition and vertical angles
3. Theodolite survey traverse
4. Heights and distances - Triangulation - Single plane method.
5. Tacheometry - Tangential system - Stadia system - Subtense system.
6. Setting out works - Foundation marking - Simple curve (right/left-handed) -
Transition curve.
7. Field observation for and Calculation of azimuth
8. Field work using Total Station
Total: 60
LIST OF EQUIPMENTS
(For a batch of 30 students)
S. No. Description of Equipments Quantity
1. Total Station 3 Nos
2. Theodolites
Atleast 1 for every 10
students
3. Dumpy level
Atleast 1 for every 10
students
4. Plain table
Atleast 1 for every 10
students
5. Pocket stereoscope 1
6. Ranging rods
7. Leveling staff
8. Cross staff
9. Chains
10. Tapes
11. Arrows
1 for a set of 5 students
No comments
Post a Comment