JOB EXECUTION PROCEDURE FOR PLASTERING

By
Advertisement Flower



CONTRACTOR:

JOB EXECUTION PROCEDURE FOR PLASTERING


DOC NO:
QC -
CONTRACT NO:
REPORT NO:
CONSULTANT: GEL
DATE:
Structure:
Ref. Drawing no:
Location:
Approx. quantity:
Type of Plastering:
Mortar Mix:
1
Before Plastering
a
Check for hacking:
b
Provision for chicken mesh:
c
Preparation of surface, remove efflorescence:
d
Services/Fixtures, Doors/Windows:
e
Pre-wetting of surface:
       f
Thickness of mortal pads:
2
During Plastering
a
Addition of water proofing compound:
b
Proper roughening of first coat:
c
Clearing of dead mortar:
d
Check for grooves/drip moulds:
3
After Plastering
a
Curing
b
Check for hollowness:
c
Check for surface texture:

Contractor

Consultant

Client